Period
|
Project
|
|
1979 - 1982
|
Export general contracting: construction of a 193 km, DN 80 - DN 1200 gas pipeline in Irak (Bashra).
|
|
1979
|
Scope of activities of the company broaden, e.g.: construction of TESTVÉRISÉG II gas pipeline, of main collector in Kiskunhalas, of inert gas pipeline.
|
|
1975 - 1977
|
Designing ADRIA oil pipeline.
|
|
1973
|
Designing TESTVÉRISÉG gas pipeline.
|
|
1970 - 1975
|
Designing Tisza Oil Refinery plants.
|
|
1965
|
General designing of facilities at Algyő oil and gas site. Starting of ÁFOR propane-butane storage and filling yard program.
|
|
1964
|
Start of designing of Danube Oil Refinery..
|
|
1963
|
Designing Hajdúszoboszló gas preparatory, start of designing country-wide gas pipeline network.
|
|